Aircraft hangars · Fort Worth, TX
Hangar floor coatings in Fort Worth
Fuel, hydraulic fluid, a tug that parks in the same spot, and sunlight that beats down on the hangar floor every time the doors open. Our owner is a military and commercial pilot himself, so tell us what actually lands on your floor and we will tell you what holds up.
- Veteran owned and operated
- Our own crews install the floor
- Based in Fort Worth, out across DFW
The system
The coating system for hangars.
Weight on wheels running the same line, what gets spilled, and the light through an open door. Those three decide the system, and we settle them before we name one.

Flake goes on the shop side: the workbench, the parts room, the office end of the building. Metallic is a finish floor, not a work floor, so it doesn't go under an airplane.
- Built for
- Hangar floors and the shop side of the building
- Where
- Inside the building
- Surface
- Texture, not gloss
- The pick
- Settled on the walk, off what hits your floor
The floor
What a hangar floor looks like.
Hangar floor
Two airplanes standing on the coated slab
Work bay
An empty bay, a tool chest, and the floor under them


Floor visualizer
See it on your own floor.
Upload a photo, pick a system and a color, and see your floor in about thirty seconds.
How a job runs
How we coat a hangar floor.
What customers say
Reviews of General Striping, LLC, the Fort Worth company behind Gilded Surfaces.
Price
What aircraft hangar floor coating costs

Flake
$4 to $9
per sq ft installed

Quartz
$6 to $11
per sq ft installed

Metallic
$7 to $12
per sq ft installed
What moves the price
Floor size
Bigger floors cost less per square foot. T-hangar or box hangar changes the number.
Slab condition
Old coating, grease and joints that still move add grinding, filling and repair before the first coat.
The schedule
One empty hangar costs less than a floor coated in pieces around the airplane.
Want to know what your project would cost?
Get my free estimateFinancing
Pay over time, up to $75,000
The application takes minutes. Ask for it with your quote.
Warranty

year limited workmanship warranty
Covers the coating
- Lifting
- Peeling
- Separating from the concrete
- Interior flake, quartz and solid‑color epoxy floors
- In writing before you sign
Prices shown or discussed on this website are indicative.
What a hangar floor asks
What a hangar floor has to handle.
A hangar floor asks different questions than a warehouse floor, starting with what happens when fuel or hydraulic fluid hits it. Wheels are the easy part. Spills, point loads and sunlight are the rest.

What gets spilled.
No floor coating is chemical proof. Coatings resist specific chemicals, at specific concentrations, for a specific amount of time, and that comes off the manufacturer's chart. Some of the hydraulic fluids used in aviation are hard on coatings, and which one is in your airplane changes the answer. So we won't claim ours shrugs it off. Tell us what you run, what gets spilled, and how long it sits before somebody wipes it up. That answer shapes the whole system.
What stands on it.
Point loads come next. We want to know what stands on the slab and where: the airplane, the jack, the tail stand, the tug.
What the light does.
A hangar door is a wall of light. An epoxy top coat ambers under that much sun, and the aliphatic clear coats do not. So the clear coat gets picked for the light in your building.
Sun means a polyaspartic clear coat. No sun means an epoxy clear coat.
Who you are hiring
Our founder is a Marine aviator and a pilot.
He's still on site for the big jobs.
When we walk your hangar, you're not explaining your building to a flooring contractor.
Trip Littleton
Founder, General Striping and Gilded Surfaces

The schedule
Where the airplane goes while we work.
What you're really buying is the days the airplane is somewhere else. The floor is the simple part to schedule. The airplane is not.

We grind first and coat behind it. How a hangar gets split into pieces depends on the building, and we settle that before we put a date on the calendar.
Grinding concrete makes dust, and it makes it in a building with an airplane in it. We run extraction on the grinders, and on a decorative coating the prep is diamond grinding.
A hangar is a roof over a slab, so the season does not decide your date. What it does decide is the hour. A concrete slab runs behind the air, and a slab that is warming pushes air up through a wet coating. That's why a summer job gets scheduled around the slab.
The walk
What we look at on site.
We come out, take measurements, and check the condition of the concrete. Where it needs repair, how much grease has to come out, how much prep it takes.

Old coating comes off here.
We grind failed coatings down to bare concrete before anything new goes down.
A hangar slab is a big sheet of concrete lying on wet ground.
Vapor that cannot escape through the top of it gathers under a closed coating and lifts it. That failure is settled on the walk, not in the bucket.
So we meter the whole slab by hand first, and then we set relative humidity probes in the concrete. If there is no vapor barrier under the slab we recommend one, and that does not affect the price by much, if any.
Joints and cracks are their own job.
A coating does not bridge a crack that still moves. That is physics. You want to know that before we start. A control joint keeps working after we coat it, so the trade answer is a semi rigid filler in the joint that carries the edge when a wheel crosses it, and we tell you which joints need it before we grind.
And we ask how you use the floor.
Wheels, weight, spills, and how you clean it.
Send photos and rough measurements first if you want a direction before anyone drives out, or put this hangar in writing.
Our area
Serving Fort Worth and DFW.
We work out of Fort Worth and cover Tarrant County. For a larger hangar we go further out across DFW.
Fort WorthDallasDentonShermanTylerWacoAbileneWichita Falls
2205 Wenneca Ave, Fort Worth, TX 76102 · (682) 610-8443
Straight answers
Questions we get on hangar floors.
That depends on the size of the floor, the state of the slab, and whether the work has to go down in pieces. We count the days on the site walk and put them in writing next to the price.
A wet floor by an open door is slick on any resin system. What you stand on is the aggregate we broadcast, plus whatever grip goes into the last coat. Flake and quartz floors have texture and do not require an anti-slip additive.
Three different times, and they're not the same day. You can walk on it after 8 to 10 hours. You can put weight on it after 48 to 72 hours. Full chemical cure comes last, at seven days. Walking on a floor and spilling something on it are two different days.
It changes the schedule and it changes the number. It doesn't change the questions. Spills, point loads, and how much prep the concrete needs. Those three we walk in every hangar.
General Striping, LLC, in Fort Worth since 2012. Gilded Surfaces is the coatings division. The contract and the paperwork run under the LLC.
Get my free quote
Get a free quote for your hangar.
COI and W-9 on request.
The budget field can stay empty.
Or call (682) 610-8443, anytime, 7 days a week.
Financing
You can pay over time.
Ask for it when we send your written price.









